During the night in the southeast, the snowfall continued with high intensity. From the information received so far, it is known that in the mountainous areas above 1200 meters, the thickness of the snow varies from 50 cm to 60 cm.
More specifically, in Dardha, the thickness has reached 50 cm, but there are no problems with circulation since the opening of the segment has become possible, however, winter tires are needed. In Voskopoja, the thickness has reached 20 cm, but even in this village there are no problems with circulation.
As for mountainous areas such as the village of Panarit, it is known that at the point of Mashkullora it has reached 60 cm, while snowplows will be used to keep traffic open. There are no traffic problems on national roads, all roads are passable.
On the new road of Erseka, traffic is prohibited and to go to this city the old road must be used. In the southeast, since yesterday evening, there have also been problems with electricity.
According to information, there are 6 subscribers without power in Vithkuq, and 2 cabins that have malfunctioned in Brozdovec of Lekas. In the area of Červenaka in Gur te Kuq there are 12 subscribers without energy, in the Podgozhan feeder 160 subscribers. In Pustec there are about 570 subscribers without electricity, which include Gorica e Madhe, Gorica e Vogël, Kallamas, Gollomboç. In Devoll, the situation remains more difficult due to the fact that 3,210 subscribers in the whole municipality are left without electricity.
It is learned that without electricity are the areas of Dardha, Mollas, Gjançi, Lavdar, where the number of subscribers reaches 270 subscribers. It is known that in Panari there are problems with 50 subscribers, while in Lozhan i Maliqi 100 subscribers have been left without electricity.
In total, in the southeast there are more than 4000 subscribers without electricity, while the work groups are on the ground to repair any possible defects, but we must remember that at least the deep mountainous areas have problems with the amortization of the network, which makes it more difficult the work of the teams and the duration of the lack of electricity.